Snagging a new build in Spain 2026: the 60-point list

Buying

Snagging a new build in Spain 2026: the 60-point list

13 July 20267 min read

Share this article

When to snag

Three weeks before the scheduled escritura date. Earlier is too unfinished; later leaves no time to negotiate.

The 60 points (categories)

Floors, walls, ceilings (cracks, levelness, paint coverage) · Windows and doors (alignment, locks, seals) · Bathrooms (silicone, drains, taps, pressure) · Kitchen (appliances tested, hood vented, undercabinet lights) · Electrics (every socket, every switch, RCD trip test) · Plumbing (hot water at every tap, drainage flow) · HVAC (every unit tested cold and hot) · Outdoor (terrace drainage, balustrade safety, screens) · Common areas (lifts, pool finish, lighting).

Personal help

Get matched with the right agent — free

Three steps, no obligations. We connect you with 1–3 specialist agents who actually work in your segment.

Start matching

Engaging a snagging surveyor

Local English-speaking surveyors (Survey Spain, Inmosnag) charge €450–€900 for a 60–90-point report. Worth every euro.

The 10-year guarantee (LOE)

Structural defects: 10 years. Habitability defects: 3 years. Finishing defects: 1 year. Document everything at snagging.

See off-plan buying guide and new build vs resale.


Want personal help? Get matched with a specialist agent → · Book a buyer concierge → · Run the cost calculator →

Share this article

Book a concierge

Bespoke help through the entire process — from agent selection to signed deeds.

See packages

Get our guides by email

Monthly newsletter with market reports and off-market scoops.

Subscribe